Before 22,000 square feet of our new building can be transformed into a space designed specifically for our students, there was work to be done. 

The first step? Building a delineating wall to separate Rustic Cuff’s space from our active construction site, creating a clear boundary so construction could safely begin. 

Then came the early demo phase. Small fixtures were removed. Walls were prepped. The space started to shift. 

But before the dust fully settled in, we made sure to capture “before” photos, because this transformation is going to be remarkable. 

As of February 9th, construction is officially underway. 

What was once simply a building is now becoming a future filled with classrooms, connection, accessibility, and opportunity for adults with intellectual and developmental disabilities. 

We can already picture students walking the halls.
Learning.
Laughing.
Belonging. 

Below are some before photos of our new space.

A photo of an exterior wall with a big metal door and a smaller door.

This will be the entrance to Pathways

A photo of a shipping dock

This will transform into an outdoor classroom and fitness space.

A photo of a fence and parking lot

Another area that will become an outdoor classroom and fitness space.

A photo of a wall with a lot of graffiti type art and many chandeliers

This space will become the reception area

A photo a wall and empty warehouse space

Future Pathways classrooms

A photo a open space.

This is a look at what will become the commons, nutrition center, and so much more!